OKB COIN

OKB Coin​​Digital Currency Market Information Platform

fort gibson dam ok,History of Fort Gibson Dam

fort gibson dam ok,History of Fort Gibson Dam

Fort Gibson Dam OK: A Comprehensive Overview

Fort Gibson Dam, located in Oklahoma, is a marvel of engineering and a significant landmark in the region. This article delves into the various aspects of the dam, from its history to its impact on the local community and the environment.

History of Fort Gibson Dam

fort gibson dam ok,History of Fort Gibson Dam

The construction of Fort Gibson Dam began in 1948 and was completed in 1952. The dam was built by the United States Army Corps of Engineers to provide flood control, hydroelectric power, and water supply for the surrounding area.

Design and Construction

The dam is an earth-filled embankment type, with a height of 194 feet and a length of 2,615 feet. It spans the Arkansas River and creates a reservoir with a surface area of approximately 22,000 acres. The construction involved the excavation of 5.5 million cubic yards of earth and the placement of 1.5 million cubic yards of concrete.

Environmental Impact

The creation of the Fort Gibson Lake has had a significant impact on the local environment. The lake provides a habitat for various fish species, including bass, catfish, and crappie. It also serves as a recreational area for fishing, boating, and camping. However, the dam has also led to the loss of some wetland areas and the displacement of some wildlife.

Impact Positive Negative
Wildlife New habitats for fish and birds Displacement of some wildlife species
Recreation Boating, fishing, and camping opportunities Increased human activity in some areas
Water Supply Water supply for local communities Altered natural water flow patterns

Hydroelectric Power Generation

The dam is equipped with two hydroelectric generators, each with a capacity of 40 megawatts. These generators produce approximately 200 million kilowatt-hours of electricity annually, which is enough to power about 20,000 homes.

Community Impact

The dam has had a significant impact on the local community. It has provided jobs during the construction phase and continues to support the local economy through tourism and recreational activities. The lake has also become a popular destination for outdoor enthusiasts, contributing to the region’s reputation as a recreational paradise.

Challenges and Future Outlook

Like any large infrastructure project, Fort Gibson Dam has faced its share of challenges. One of the main concerns is the potential for flooding, especially during heavy rainfall. The U.S. Army Corps of Engineers has implemented various measures to mitigate this risk, including floodgates and spillways.

Looking to the future, the dam continues to be an essential part of the region’s infrastructure. The U.S. Army Corps of Engineers is committed to maintaining and improving the dam to ensure its continued operation and benefits to the community and environment.

Fort Gibson Dam, OK, stands as a testament to human ingenuity and the importance of balancing development with environmental stewardship. Its history, design, environmental impact, and community benefits make it a fascinating subject for anyone interested in engineering, environmental science, or the history of Oklahoma.